HIVE ROV Control Room 1
The HIVE is the ROV command and control room at the Crisis Center at Westlake 4 in Houston, TX. 6 July 2010
Images from the bridge OnBoard Q4000 during the "Static Kill"
The bridge onboard the Q4000 during the "Static Kill" in the Gulf of Mexico at the MC 252 site, on 03 August 2010.
ROV Shack onboard the Transocean Development Drille
ROV Shack onboard the Transocean Development Driller II at the MC 252 site, Gulf of Mexico 26 June 2010
Capping stack BOP is being readied for shipment 1
Capping stack BOP is being readied for shipment out to the MC 252 site. The capping stack BOP will attach to the well bore to be able to stop flow and divert to vessels. This capping stack has been under construction for approx 2 months at the Cameron facility in Berwick, LA. 29 June 2010